This project consisted of a new build timber frame super structure creating a 469 bed student accommodation block.
The duration of our works was 10 months with a value of approx £1m
https://lindumgroup.com/news/2019/10/teamworks-was-key-to-valentine-court-completion
https://accommodation.lincoln.ac.uk/valentine-court/
Full Design & Build Electrical Installation
The disciplines included:
LV distribution.
Internal & Emergency Lighting.
External lighting.
General power.
Data/ phone systems.
Fire Alarm.
Intruder Alarm.
Access Control.
IRS (TV system).
Lightening protection.